impact
Type of resources
Topics
Keywords
Contact for the resource
Provided by
Years
-
This dataset details all tropical cyclones that are known to have occurred in the region south of the equator between 90E and 160E. The data has been sourced from the Tropical Cyclone Database, maintained by the Bureau of Meteorology (BOM). This record represents a snapshot of the data taken on 23/03/2023 for the purposes of generating a mapping visualisation of recent cyclone activity. The most current database can be downloaded from the BOM website: http://www.bom.gov.au/cyclone/tropical-cyclone-knowledge-centre/databases/ Point data from the BOM has been converted into cyclone tracks for visualisation. The data and mapping layer will be refreshed annually following cyclone season (May-June each year). Last updated 21st November 2023.
-
This record provides an overview of the scope of NESP Marine Biodiversity Hub Project E1 - "Guidelines for analysis of cumulative impacts and risks to the Great Barrier Reef". No raw data products are anticipated for this project. -------------------- The project will develop guidance for the analysis of cumulative impacts and risks to the environmental, social and economic values of the GBR. The project will use existing information to develop guidance for use by GBRMPA, DoEE, the Queensland Government and proponents of future development proposals. The project will build on the work undertaken in the GBR Strategic Assessment and support works undertaken under the Reef 2050 plan. The guidance will provide a practical science-based approach to assessment of cumulative risks to the Reef. Research will focus on providing a general and repeatable approach to be applied at the whole-of-reef scale (to meet planning, assessment and reporting requirements of the GBRMPA) and also at the development-site-scale (to meet the environmental assessment requirements of the GBRMPA and future proponents). The guidance will be developed in close collaboration with the GBRMPA and DoEE to ensure it is practical and compatible with relevant legislation and policy applicable to proposed actions within the GBR. The project will include a case study focused on attributing impacts of pressures and their cumulative impacts on shallow-water coral reefs of eastern Australia (including cumulative impacts for the whole-of-GBR). It will also examine how this could be applied to shallow temperate reefs follow recent risk assessments conducted in NSW. Research is primarily designed to meet the specific needs of GBRMPA and future proponents. NSW DPI, QLD Government and Parks Australia, may also benefit from the case study and insights to assessment of cumulative impacts. Planned Outputs • Case Study Report on GBR & Coral Sea reefs pressure analysis. • Final report - guidance for analysis of cumulative impacts and risk
-
This record provides an overview of the scope and research output of NESP Marine Biodiversity Hub Project E3 - "Microplastics in the Australian marine environment". No data outputs are expected for this project. -------------------- A literature review will firstly identify key marine microplastics research and policy development internationally, with a focus on research that is contextual to microplastics in the Australian marine environment From this literature review, an options paper will be developed to explore the most feasible and impactful policy approaches for the Australian context to reduce both intentionally added and not intentionally added microplastics in the marine environment (it would be beneficial to understand the policy options that can address both categories of microplastics because the options are different). These two reports would form the basis of a one day workshop that will draw together policy-makers, researchers and relevant industry peak bodies to discuss and recommend policy and other options to limit the release / impact of microplastics in the environment. A workshop report will be drafted to summarise findings, recommendations, and next steps (including identifying gaps in both science and policy will inform any future work required). The report will provide evidence to underpin the development of national policy aimed at reducing microplastic pollution, including by identifying priority actions to deliver Australia’s 2018 National Waste Policy .
-
This record provides an overview of the scope and research output of NESP Marine Biodiversity Hub Project C1 - "Improving our understanding of pressures on the marine environment". For specific data outputs from this project, please see child records associated with this metadata. -------------------- The marine environment in Australia is influenced by a wide range of different pressures that impact on different parts of the marine ecosystem in different ways. This project aims to assist DoE, and other research users, to improve understanding of the potential impacts of anthropogenic disturbance to marine conservation values by providing up-to-date data and analyses on the spatial distribution of pressures and trends. The research is designed to inform decision making under the EPBC Act (acceptability of proposed activities, evaluation of effectiveness of mitigation measures) on NMES (including Key Ecological Features), implementation of multiple strategies in four Marine Bioregional Plans (i.e. strategies B, C, D and F), management of Commonwealth Marine Reserves (e.g. strategies 1 and 2 in the South-east Commonwealth Marine Reserve Network Management Plan 2013-23) and State of the Environment reporting. The project will involve a re-examination of the pressure analyses undertaken through the marine bioregional planning program and the 2011 SOE Report (marine chapter) and determine where pressure mapping can be improved to enhance those analyses (for instance for those pressures for which data deficiency was identified). It will also examine the strengths and weaknesses of the different pressure assessment methodologies used by both the MBP process and the SOE 2011 process and propose a methodology that can support both initiatives into the future. The project will provide pressures profiles for CMRs and will assist Parks Australia in understanding how pressures interact with the values they identify in CMRs. The project will also consider relative impact, and how spatial mapping can assist in understanding both relative and cumulative impact. As an adjunct to the cumulative impact investigation, the project will also investigate how changes in socio-economic valuing of conservation values may influence the degree of investment in understanding and management of cumulative impact. This particular work will further the risk-based approach to cumulative impact that was investigated under the NERP Hub. Planned Outputs • Produce description of summary of changes and trends in pressures on the commonwealth marine environment in the offshore marine environment from 1991 to 2010. • Production of inshore and offshore pressure summaries to inform SOE reporting (2011-2015) • Produce description of trends in pressures acting on the commonwealth marine environment (onshore & offshore) between 1991 & 2015, with refined summaries for all KEFs and CMRs. • Distribute pressure data and pressure data summaries through NPEI compliant data infrastructure. • Produce analysis and description of the likely future states (for example, climate (interannual and decadal), shipping, modification of fisheries activity, coastal eutrophication) • Re-evaluation of the pressure assessments published in the 2012 Marine Bioregional Plans , ensuring consistency of output, updating the profiles for all KEFs • Report on the changing socio-economic valuing of conservation values to the concept of acceptable impact, or acceptable risk of impact • Report on a risk based framework to manage the uncertainty information bases for different decision making requirements with example case